English translation of OSAKA CITY SEWERAGE SCIENCE MUSEUM exhibits (3F)
2025年3月31日
ページ番号:634666
How has the Osaka City's sewerage system developed?
It has been more than 400 years since sewer ditches were made for sewage in the era of Toyotomi Hideyoshi. Let's see the progress of sewerage system that has been developed so that residents of Osaka City can use it!
Picture Scroll Depicting the History of the Sewerage in Osaka
Topographical Features of Osaka
Osaka City consists of the Uemachi Plateau extending from south to north and the lowland area around it.
Over the years, Osaka has developed into an urban area, while its topographic feature remained unchanged.

Taiko (Sewari) Gesui was constructed.
Sewer construction in Osaka began during the town development associated with the construction of Osaka Castle for Toyotomi Hideyoshi. Subsequently, sewer ditches continued to develop throughout the Edo period.
These sewer ditches are called Sewari Gesui (back to back sewer ditches) as they were dug between the backs of the houses built along the streets, or Taiko Gesui in honor of Toyotomi Hideyoshi (Taiko was his title and nickname). Some of these sewer ditches are still in use today.
Sewerage projects began.
The first sewerage project started in 1894, prompted by a cholera epidemic. (Central Sewerage Improvement Project)
Osaka City has actively advanced the development of its sewerage system since the Meiji era. Today the system covers almost all areas of the city.
Osaka was officially incorporated as a municipality. (April 1889)
Commencement of the Central Sewerage Improvement Project (December 1894)
- The first Sewerage Improvement Project began. (August 1911)
- Urban Planning, Phase 1 Sewerage Project began. (June 1922)
- Urban Planning, Phase 2 Sewerage Project began. (September 1924)
- Sewage treatment experiment began in Ichioka Pumping Station. (December 1925)
- Urban Planning, Phase 3 Sewerage Project began. (September 1928)
- Urban Planning, Phase 4 Sewerage Project began. (December 1931)
- Urban Planning, Phase 5 Sewerage Project began. (May 1937)
- Osaka Municipal Ordinance on Sewerage System enacted. (March 1938)
Sewage started flowing into the Tsumori Sewage Treatment Plant (STP) and Ebie STP. (April 1940)
- Collection of the sewerage usage fees began. (April 1940)
- Project of the 10-Year Sewerage System Development Plan began. (April 1960)
- Sewage started flowing into the Nakahama (east) STP. (May 1960)
- Sewage started flowing into the Ichioka STP. (April 1961)
- Sewage started flowing into the Nakahama (west) STP. (August 1963)
- Sewage started flowing into the Chishima STP. (October 1963)
- Sewage started flowing into the Sumiyoshi (now Suminoe) STP. (December 1964)
- Sewage started flowing into the Imafuku STP. (June 1966)
- Sewage started flowing into the Hanaten STP. (October 1967)
- Sewage started flowing into the Ono STP. (November 1967)
- Sewage started flowing into the Konohana STP. (July 1968)
- The first Osaka City 5-Year Project for Sewerage System Development began. (October 1968)
- Sewage started flowing into the Juhachijo STP. (March 1970)
- Sewage started flowing into the Hirano STP. (April 1972)
- The second Osaka City 5-Year Project for Sewerage System Development began. (November 1972)
- The third Osaka City 5-Year Project for Sewerage System Development began. (April 1977)
100% coverage of flush toilet system achieved in Minami Ward (now part of Chuo Ward). (October 1977)
- The fourth Osaka City 5-Year Project for Sewerage System Development began. (April 1981)
- Construction of Benten Pumping Station and the main part of Tennoji-Benten Trunk Sewer completed. (March 1982)
- The fifth Osaka City 5-Year Project for Sewerage System Development began. (April 1984)
- The sixth Osaka City 5-Year Project for Sewerage System Development began. (April 1988)
- The seventh Osaka City 5-Year Project for Sewerage System Development began. (April 1992)
- Operation of the sewerage ledger system and rainfall information system began. (April 1993)
The 100th anniversary of the Osaka City sewerage system project (December 1994)
- OSAKA CITY SEWERAGE SCIENCE MUSEUM opened. (April 1995)
- The eighth Osaka City 5-Year Project for Sewerage System Development began. (April 1997)
- Suminoe Pumping Station (Naniwa Grand Floodway) completed. (March 2000)
- Operation of the melting furnace at the Hirano STP began. (September 2000)
- The ninth Osaka City 5-Year Project for Sewerage System Development began. (April 2001)
- Urgent Countermeasure for Combined Sewer Overflow Control launched (February 2003–March 2024)
- Stormwater started flowing through Tsumori STP’s on-site pumping station. (March 2003)
First phase of Maishima Sludge Center construction completed. (March 2004)
- OSAKA CITY SEWERAGE SCIENCE MUSEUM reopened after renovation. (March 2005)
- Sewage started flowing through Tsumori STP’s on-site pumping station. (March 2005)
- Rooftop facilities on Hanaten STP opened. (April 2005)
- Osaka City designated Taiko (Sewari) Gesui as a municipal cultural property. (December 2005)
- Second phase of Maishima Sludge Center construction completed. (March 2007)
- Development project of power generation utilizing digestion gas (implemented as a PFI project) at Tsumori STP began. (October 2007)
- Third phase of Maishima Sludge Center construction completed. (March 2010)
- Project for converting sewage sludge into solid fuel (implemented as a PFI project) at Hirano STP began. (April 2014)
- Kitahama-Ousaka Stormwater Storage Pipeline (Heisei no Taiko Gesui) completed. (March 2015)
Osaka City established Clearwater OSAKA Corporation (July 2016); began comprehensive outsourcing of sewerage facilities to this company (April 2017)
- Project of power generation utilizing digestion gas at a sewage treatment plant (under the FIT scheme) began. (April 2017)
- Renovation of the water treatment facility at Ebie STP by PPP/PFI methods began. (September 2017)
- As part of the Nakahama STP water treatment facility development project, discharge of the water treated by an ultra-advanced treatment into the Higashi-Yokobori River began. (August 2021)
Construction of Sewage Treatment Plants
In 1923, the Osaka City Sewage Treatment Plan was compiled. In April 1940, the first two sewage treatment plants in Osaka City commenced their operation in Tsumori and Ebie.
Since then, construction of sewage treatment plants continued, and there are 12 sewage treatment plants in the city today.

100% coverage of flush toilet system achieved
In 1977, Minami Ward (now part of Chuo Ward) achieved 100% coverage of flush toilet system which was the first among all municipalities in Japan.
Now, the percentage of the population served by sewer service is 99.9% in Osaka City.

The 100th Anniversary of Sewerage System Project
Osaka City marked the 100th anniversary of the commencement of the Central Sewerage Improvement Project in 1994, and various commemorative events were held.
The manhole cover with Osaka Castle design was created at that time.

Construction of the Maishima Sludge Center
Maishima Sludge Center was constructed for efficient treatment of increasing sewage sludge and effective use of the sludge (March 2004). Sludge centralized treatment is implemented in Hirano STP and two other locations in Osaka City.

01 Osaka, the City of Water, in the Past
Urban Development and Sewerage in Osaka
In 1583, Toyotomi Hideyoshi began the town planning process associated with the construction of Osaka Castle, and the foundation of Osaka was formed in the Uchimachi and Semba areas (present-day Chuo Ward). In addition to the construction of roads, stone masonry sewage ditches were built to eliminate the sewage discharged from the town houses. The idea of building a town with roads and sewers is highly regarded as an epoch-making event in the history of urban planning in Japan.

Taikou(Sewari)Sewer
The castle town, surrounded by the Yokobori River on the east and west, was divided into a grid pattern along the east-west road leading to Osaka Castle, and sewage ditches were dug at the backs of the buildings facing the road (rear entrance). This sewage trench was called "Sewari gesui" or "Taikou gesui" after Taikou Hideyoshi, and part of it is still in use today as an active sewage facility.

02 Osaka City, Water, and Environment
Sewage treatment plant in Osaka City
There are currently 12 sewage treatment plants in Osaka City, which together process 2,844,000 cubic meters of sewage per day. The total length of the city's sewage pipes is approximately 5,000 kilometers, and the sewage system supports the comfortable lives of citizens.

03 Advanced Wastewater Treatment
Ebie Sewage Treatment Plant
The Ebie Sewage Treatment Plant, together with the Tsumori Sewage Treatment Plant, was the first in Osaka City to begin service in 1940, and currently treats sewage from all of Fukushima Ward, most of Kita Ward, and part of Konohana Ward. The plant's three water treatment facilities employ a hybrid method that combines the MBR (Membrane Bioreactor) and A2O (Anaerobic Anoxic Aerobic) methods for advanced sewage treatment in order to protect the environment in the discharge water area.

High rate Filtration Facilities
Resistant to water volume fluctuations and space saving. Effective in protecting MBR membrane units and supporting various emergency treatments.
MBR
A sewage treatment method that filters treated water through membranes with pores as small as 10.2µm (2/10,000 mm). The equipment is compact, the treated water quality is good, and the water can be used as recycled water.

04 Mechanism of High rate Filtration
High rate filtration system
The high rate filtration system uses an upward-flow filtration system with floating filter media, making it more compact than conventional sedimentation tanks and allowing for improved treatment performance. It can remove almost all foreign substances in the inflow water, and also serves to protect the membrane of the MBR in the subsequent stage (e.g., to prevent damage). In addition, the system can treat large volumes of sewage through simple filtration during rainy weather.

Filtration Process
Utilizing the difference in water head, filtration is performed by upward flow, and pollutants are captured in the gaps between the filter layers.
Cleaning process
Automatic cleaning by timer or filtration resistance detection.